Estimated Project Value: $36M
Barletta Contracted with RIDOT for this $36M Design-Build Project. Michael Baker was hired to be the Project’s Lead Designer. This Project consists of the Design and Construction of a new Bus Hub and Train Station along Amtrak’s Northeast Corridor and the MBTA’s Providence Commuter Rail Line, and a Transit Emphasis Corridor through Pawtucket. Our design integrates two transit modes into one cohesive multimodal transportation facility.


