Project Value: $50M
This project involved the construction of a new 13,925 square foot, 240-million-gallons per day pumping station, consisting of below grade, at grade, and mezzanine levels. The building houses 7 vertical turbine pumps with 750 horsepower motors, an 84” pump discharge line, and connects to and reroutes the existing 120” Wachusett Aqueduct Bypass line.