MWRA Union Park Detention Treatment

Project Details

Project Value: $43M

This project involved construction of the Union Park CSO DT Facility including the screening facility, detention basins, odor control facility and improvements to the existing pump station. New pumps, screening, disinfection and odor control equipment were installed. Additional work required included demolition, excavation, dewatering, bypass pumping, backfill, concrete, concrete reinforcement, equipment pads, construction joints, piles, sheeting, utilities, lighting, paving and landscaping.