Barletta Engineering | Heavy Division » Call 781-821-6222

MWRA Alewife Brook Pump Station

Project Details

Project Value: $13M

Barletta made major operational and structural improvements to the Alewife Brook Pump Station. Existing sewer pumps, original to the 1951 station, were replaced by two, higher-capacity wet-weather pumps and a dry-weather pump, with a third wet-weather pump available for standby use. Other operational improvements include the replacement of motors, gear drives, controls, screens, sluice gates and generators. The Alewife Brook Pump station’s HVAC systems, paint, roofing, and insulation were also updated, and a new flow meter was installed on the Alewife Brook Conduit.

Our Business is Building