Estimated Project Value: $21M
The scope included the replacement of the existing freight rail Seaport Track, which runs adjacent to Haul Road (known as Track 61), and connection of the new test track to Cabot Yard.
Barletta Engineering | Heavy Division » Call 781-821-6222
Scroll
Estimated Project Value: $21M
The scope included the replacement of the existing freight rail Seaport Track, which runs adjacent to Haul Road (known as Track 61), and connection of the new test track to Cabot Yard.