Estimated Project Value: $18M
The work of this project consists of providing construction related services on an on-call basis to support emergency, urgent and routine repair/reconstruction needs of the MBTA. Work consists of demolition and reconstruction of light rail infrastructure and related facilities at various locations along the Green Line E Branch to bring the identified facilities into a state of good repair. The scope of work includes full depth, light rail track reconstruction including rail/ties/ballast, guard rail, underdrains and tamping located within tunnel areas, portal areas, roadway reservations and street-running track areas; full depth construction of at-grade crossings including rail/ties/ballast; full scale removal/replacement of asphalt paving and replacement of turnouts, with special trackwork completed as needed. 6 individual double track road crossings and 5 individual pedestrian grade crossings, as well as Fire Department emergency access crossings were also installed. Pedestrian crossings included necessary rubber panel and tactile surfaces for pedestrians and compliant detectable warning panel installation.


