Project Value: $6M
The scope of this project required Marine Construction techniques for the demolition of the existing bridge as well as the new permanent structure. Temporary supports were installed within the limits of the river to facilitate the phased construction. Access for aspects of demolition of the old/construction of the new bridge had to be performed from the water.