Project Value: $14M
The Work consisted of the complete demolition and removal of the existing elevator hoist way and all elevator components, then rebuild / replacement of same, in both Harvard & Central Red Line Subway Stations; which extend from the Red Line central mezzanine lower level up to the street level plaza in Harvard Square [Harvard Station Portion], and from the Red Line inbound platform up to street level grade in Central Square [Central Station Portion]. Adjacent to the elevator at the Red Line level, the existing elevator machine rooms and equipment is replaced with new construction. Also included is mechanical, electrical, communications and as well as structural, glazing, roofing and all architectural finishes work to support the new elevator scope. Site work includes replacing paving adjacent to the new head houses.