Barletta Engineering | Heavy Division » Call 781-821-6222

MassDOT Middlesex Turnpike Phase III

Project Details

Estimated Project Value: $35M

Similar to the other phases of the project, the Middlesex Turnpike will be widening Lexington Road and Manning Road lanes in each direction, with protected left turn lanes at all driveways. Additionally, new traffic control signals will be installed at Oak Park Drive in Bedford and 900 Middlesex Turnpike, Lexington Road, and Manning Road in Billerica. There will be bike lanes and sidewalks along both sides of the roadway.

Our Business is Building