Barletta Engineering | Heavy Division » Call 781-821-6222

City of Cambridge Huron B Sewer Separation

Project Details

Project Value: $44M

BHD self-performed all major sewer/drainage, water, and utility work on this job. Major components included separation of approximately 25,000 linear feet (4.7 miles) of combined sewer by replacement, rehabilitation, or addition of RCP, PVC and Ductile Iron storm and sewer pipe with their respective manholes and catch basins. Additional work included the replacement of approximately 1600 linear feet of an existing 100+ year old, 40-inch, riveted steel water main, 190 new manholes, 138 new catch basins, 132 new gate valves, and 25 new hydrants.

Our Business is Building